Lesson 1Configuration and commissioning checklist: IP assign, NTP, firmware, name labeling, time-lapse testThis section outlines a structured configuration and commissioning checklist, including IP addressing, VLANs, NTP, firmware, camera naming, time-lapse and recording tests, ensuring consistent, traceable settings across the deployment.
Assigning IPs, VLANs, and subnetsConfiguring NTP, time zones, and DSTStandardizing camera names and groupsUpdating firmware and saving backupsRunning time-lapse and recording testsLesson 2Client handover and documentation package: user credentials, network diagrams, SOPs, and quick troubleshooting guideThis section describes how to prepare a complete client handover package, including user credentials, network diagrams, SOPs, quick troubleshooting guides, and training records, ensuring the client can operate and support the system safely.
Creating user and admin credential listsDelivering network and topology diagramsDrafting SOPs for daily operationsProviding quick troubleshooting guidesRecording training and handover sign-offLesson 3Functional verification tests: view angles, motion detection zones, low-light performance, and fps checksThis section focuses on functional verification tests for each camera, covering field of view, focus, motion detection zones, low-light performance, frame rate, and retention checks to confirm the system meets design and legal requirements.
Validating camera views and coverageChecking focus, zoom, and image clarityTesting motion and event detection zonesAssessing low-light and WDR behaviorVerifying fps, bitrate, and retentionLesson 4End-to-end user acceptance testing: remote smartphone access, guard room workstation, and permission checksThis section explains how to run end-to-end user acceptance tests, validating remote smartphone access, guard room workstations, recording integrity, permissions, and reporting results so the client can formally approve the system.
Defining UAT scope and success criteriaTesting remote and mobile app accessValidating guard room workstation viewsChecking permissions and audit trailsDocumenting UAT results and sign-offLesson 5Pre-deployment checklist: equipment verification, test gear, cable tester and PoE validationThis section presents a practical pre-deployment checklist to validate equipment, licenses, test gear, cabling, and PoE capacity before going live, reducing on-site surprises and ensuring all critical components are ready and documented.
Verifying cameras, NVRs, and accessoriesChecking licenses and feature activationsValidating test gear and cable testersConfirming PoE budget and power sourcesStaging equipment labels and asset tagsLesson 6Network and bandwidth testing: per-camera stream checks, uplink stress test, and packet loss diagnosisThis section covers structured network and bandwidth testing for CCTV, including per-camera throughput checks, uplink stress tests, packet loss and jitter analysis, and interpreting results to adjust bitrates, QoS, and switch configurations.
Per-camera bitrate and stream verificationRunning uplink and backhaul stress testsPacket loss, jitter, and latency analysisUsing test tools and switch diagnosticsTuning QoS, MTU, and flow controlLesson 7Preventive maintenance plan: firmware updates, physical inspection schedule, and storage health checksThis section details how to build and execute a preventive maintenance plan for IP video systems, covering firmware lifecycle, scheduled physical inspections, cleaning optics, verifying storage health, and documenting findings to reduce failures and downtime.
Defining maintenance intervals and scopeManaging firmware and security updatesPhysical inspection and cleaning checklistMonitoring disk health and SMART alertsMaintenance reporting and service recordsLesson 8Common issues and remedies: poor image quality, IR reflection, intermittent connectivity, and storage overrunThis section explains how to diagnose and correct common IP CCTV issues, including soft or noisy images, IR glare, unstable network links, and storage overrun, using structured tests, logs, and configuration adjustments to restore reliability.
Diagnosing soft or noisy camera imagesFixing IR reflection and night glare problemsStabilizing intermittent network connectivityResolving NVR and NAS storage overrunUsing logs and alerts for root-cause analysisLesson 9Step-by-step installation sequence: site prep, cable runs, mounting, PoE switch setup, and camera commissioningThis section walks through a step-by-step installation sequence, from site preparation and cable routing to mounting, PoE switch setup, and camera commissioning, emphasizing safety, labeling, and verification at each stage of the workflow.
Site survey, safety, and work stagingCable routing, dressing, and labelingMounting cameras and enclosuresPoE switch setup and power checksInitial camera alignment and focus