Aralin 1Mga paghahanda sa shaft at pit: dimensions, istraktura, pit protection, drainage, at accessIpinaliliwanag ang readiness ng shaft at pit, kabilang ang mga pagsusuri sa sukat, structural supports, waterproofing, drainage, at ligtas na access. Tinutukoy ang mga pit ladders, refuge spaces, at mga protective measures para sa mga manggagawa at kagamitan.
Sukat ng shaft, plumb, at tolerance checksLalim ng pit, antas, at structural verificationWaterproofing, sump pits, at drainage pumpsPit ladders, refuge spaces, at access doorsTemporary guarding at debris protectionAralin 2Pag-install ng guide rail: alignment, plumb tolerances, rail fastenings at adjustmentsIpinaliliwanag ang pag-install ng guide rail mula sa pagkakabit ng mga bracket hanggang sa huling plumb at alignment checks. Tinutukoy ang mga tolerances, joint preparation, fishplates, at mga pamamaraan ng adjustment upang matiyak ang maayos na travel ng car at counterweight.
Spacing ng bracket, pagkakabit, at torque controlPaghahanda ng rail joint at fishplate fittingPlumb, straightness, at twist tolerancesMga tool sa adjustment, wedges, at shimsHuling ride checks sa buong taas ng railAralin 3Pag-install ng emergency systems: alarm, emergency lighting, intercom, fire service interfacesIpinaliliwanag ang pag-install ng mga emergency system tulad ng alarm, emergency lighting, intercom, at fire service interfaces. Tinutukoy ang wiring, power backup, lokasyon, at functional tests kasama ang mga building systems.
Pag-set up ng car alarm buttons at audible signalEmergency lighting circuits at autonomyPag-ro-routing ng intercom at communication lineFire service recall at override interfacesPagsubok kasama ang building fire alarm systemsAralin 4Pag-install ng electrical wiring at control panel: power supply, protection devices, earthingTinutukoy ang routing ng power at control wiring, pagkakabit ng panel, at terminations. Kabilang ang mga protection devices, labeling, earthing, insulation checks, at verification ng control logic upang matiyak ang ligtas at mapapanatiling operasyon ng lift.
Mga kinakailangan sa power supply at cable sizingPagkakabit ng panel, clearances, at ingress protectionControl wiring, labeling, at segregationPag-set up ng protection devices, fuses, at breakersEarthing, bonding, at insulation resistance testsAralin 5Pag-install at set up ng safety gear, governor, at buffersTinutukoy ang pag-install ng safety gear, overspeed governor, at buffers. Tinutukoy ang positioning, pagkakabit, setting ng tripping speed, at functional tests upang matiyak ang maaasahang pagtigil at energy absorption sa mga emergency.
Pagkakabit ng safety gear at adjustment ng linkageLokasyon ng governor, rope routing, at tensionPag-set ng tripping speed at test proceduresMga uri ng buffer, kapasidad, at fixing methodsHuling mga record ng test sa safety gear at governorAralin 6Mga pagsasaalang-alang sa machine room at MRL: lokasyon, ventilation, lighting, crane/hoist accessTinutugunan ang layout at mga kinakailangan para sa machine rooms at MRL spaces. Tinutukoy ang access, ventilation, lighting, lifting points, noise control, at housekeeping upang matiyak ang ligtas na maintenance at maaasahang operasyon ng kagamitan.
Lokasyon, access routes, at working clearancesVentilation, temperatura, at noise controlMga antas ng lighting at emergency lighting needsMga probisyon sa crane, hoist, at lifting beamHousekeeping, signage, at storage rulesAralin 7Pag-install ng motor, brake, at controller: mounting, coupling, at mechanical checksTinutukoy ang pagkakabit ng motor, brake, at controller, kabilang ang alignment, coupling, at mechanical checks. Tinutugunan ang vibration isolation, torque settings, at verification ng ligtas na access para sa hinaharap na maintenance.
Pagposisyon at pagkakabit ng machine bedplatePagkakapantay ng motor at pag-install ng couplingPagkakabit ng brake, air gap, at torque checksPaglapat ng controller at cable entry planningVibration isolation at noise reductionAralin 8Huling alignment, leveling, adjustment, at step-by-step commissioning testsTinutukoy ang huling mekanikal na alignment, car leveling, at functional adjustments. Inilalarawan ang step-by-step commissioning tests, safety checks, ride quality evaluation, at documentation na kailangan bago i-handover sa kliyente.
Huling alignment checks ng car at counterweightAccuracy ng landing level at releveling setupPagsubok sa operasyon ng pinto, clearances, at timingPagsubok sa safety circuit at overspeed governorPagsusuri sa ride quality, ingay, at vibrationAralin 9Mga paraan ng hoisting: pag-install ng ropes/belts, sheave alignment, at tensioning proceduresIpinaliliwanag ang pag-install ng hoisting ropes o belts, sheave alignment, at tensioning. Tinutukoy ang inspeksyon ng mga bahagi, routing methods, tension equalization, at verification tests upang matiyak ang maayos, ligtas, at matibay na operasyon ng lift.
Mga uri, markings, at inspeksyon ng rope at beltPagsusuri at correction methods sa sheave alignmentRoping layouts at routing sa shaftTensioning procedures at equalization toolsPost-installation tests at documentationAralin 10Pag-install ng car frame at counterweight: anchoring, leveling, at temporary supportsInilalarawan ang ligtas na pag-install ng car frame at counterweight, kabilang ang anchoring, leveling, at temporary supports. Tinutukoy ang clearances, guide shoe setup, at checks bago ikonekta ang hoisting ropes o belts.
Assembly ng car frame at identification checksPag-install ng counterweight frame at fillerTemporary supports at lifting proceduresPag-install at setup ng guide shoe o rollerPagsusuri sa clearance sa mga dingding ng shaft at railsAralin 11Pag-install ng door systems: landing frames, car doors, interlocks, at operatorsTinutukoy ang pag-install ng landing door frames, car doors, interlocks, at operators. Kabilang ang alignment, clearances, closing forces, at safety edge checks upang matiyak ang maaasahan, ligtas na operasyon ng pinto.
Pagposisyon at pagkakabit ng landing door framePag-set up ng car door hanger, rollers, at trackPagkakabit ng door operator at parameter settingPag-install ng interlock at safety circuit testsPagsubok sa door closing force at reopening deviceAralin 12Mga site safety practices sa panahon ng pag-install: PPE, fall protection, exclusion zones, lockout/tagoutNakatuon sa site safety sa panahon ng pag-install, kabilang ang PPE, fall protection, exclusion zones, at lockout/tagout. Binibigyang-diin ang ligtas na pagbubuhat, housekeeping, komunikasyon, at pagsunod sa mga regulasyon at site rules.
Pagpili at inspeksyon ng mandatory PPEFall protection, harnesses, at anchor pointsExclusion zones at pagpigil sa material dropLockout/tagout para sa electrical isolationMga kontrol sa manual handling at lifting risk