Lesson 1Landscaping and External Works Scope: Softscaping, Paving, Drainage, Lighting, and Excluded Long-Term MaintenanceOutlines landscaping and external works scope, covering plants, paths, water flow, lights. Stresses links with civil works and utilities, record standards, and clear exclusions for ongoing upkeep duties in Uganda.
Softscape planting and soil preparationHardscape paving, curbs, and edgingSite drainage and grading interfacesExterior lighting and power provisionsIrrigation systems and water sourcesMaintenance and warranty exclusionsLesson 2Electrical Scope: Service Connection, Distribution, Lighting, Power Outlets, Metering for Retail and Apartments, and Excluded Tenant Fit-OutOutlines electrical scope from entry to end circuits, including spread, lights, sockets, meters. Clarifies teamwork with power suppliers, rule following, testing, and exclusions for tenant setups in Ugandan buildings.
Utility service entry and main switchgearDistribution boards and riser routingGeneral lighting and emergency lightingPower outlets and dedicated circuitsMetering for retail and apartmentsTenant fit-out and equipment exclusionsLesson 3Demolition Scope: Included Tasks, Site Protection, Hazardous Materials Exclusion, and Utility DisconnectsExplains demolition scope, covering selective clearing, structure safety, waste handling. Highlights survey needs, temp supports, dust and noise control, and exclusions for dangerous material removal in Uganda.
Pre-demolition surveys and recordsSelective demolition and sequencingTemporary shoring and bracing needsDust, noise, and vibration controlsDebris handling and disposal routesHazardous materials scope exclusionsLesson 4Exterior Façade and Glazing Scope: Cladding Systems, Curtain Wall, Waterproofing, Flashings, and Excluded SignageClarifies scope for outer walls and glass, including cladding kinds, wall systems, water sealing, covers. Addresses performance needs, testing, structure links, and exclusions like signs and brands in Ugandan urban sites.
Cladding materials and support systemsCurtain wall design and interfacesAir, water, and thermal performanceFlashing, sealants, and terminationsGlazing types, coatings, and safetySignage and branding scope exclusionsLesson 5Foundations and Concrete Structure Scope: Excavation, Shoring, Formwork, Reinforcement, Concrete Pours, and Excluded Geotechnical RemediationDescribes base and concrete structure scope, from digging and supports to bars and pours. Covers moulds, inserts, limits, curing, and links with ground data, excluding fixes beyond design in Uganda.
Excavation limits and stockpile areasShoring, underpinning, and safetyFormwork design, stripping, and reuseReinforcement supply and placementConcrete mixes, pours, and curingGeotechnical remediation exclusionsLesson 6HVAC Scope: Central Plant vs Packaged Units, Distribution, Ventilation, Controls, Commissioning, and Excluded Tenant HVAC ConnectionsClarifies HVAC scope, including main plant or units, ducts, pipes, air flow. Defines controls, balance, startup deliveries, and exclusions for tenant extensions and special systems in Ugandan projects.
System basis: central plant vs packagedAir distribution ductwork and grillesHydronic piping and equipment linksVentilation, exhaust, and makeup airControls, BMS, testing, and balancingTenant HVAC extensions and exclusionsLesson 7Finishes Scope: Flooring, Wall Finishes, Ceilings, Doors/Frames, Painting, and Exclusions for Specialty FixturesCovers finishes scope for floors, walls, ceilings, doors, painting. Defines base prep, samples, quality marks, and trade links, clarifying exclusions for special fittings and owner items in Uganda.
Flooring types, prep, and transitionsWall finishes and substrate criteriaCeiling systems and access panelsDoors, frames, and hardware limitsPainting systems and surface prepSpecialty fixtures and FFE exclusionsLesson 8Plumbing Scope: Domestic Cold/Hot Water, Sanitary Drainage, Stormwater Disposal, Roof Drainage, and Excluded Tenant FixturesDefines plumbing scope for water, waste, storm systems, including roof flow. Addresses paths, pipe types, testing, rule compliance, and exclusions for tenant fittings and special gear links in Uganda.
Domestic cold and hot water routingSanitary drainage and venting layoutStormwater and site drainage linksRoof drainage and overflow designPipe materials, insulation, and testingTenant fixtures and equipment exclusionsLesson 9Masonry and Drywall Scope: Load-Bearing Masonry, Blockwork, Partition Walls, Insulation, and Finish TolerancesDetails masonry and drywall scope, including weight walls, blocks, dividers, insulation, finish limits. Covers structure links, fire and sound ratings, openings, and backing duties in Ugandan construction.
Load-bearing masonry and engineering dataNon-load-bearing blockwork and infillDrywall partitions and framing layoutFire and acoustic rated assembliesInsulation types and installation limitsFinish levels and tolerance criteria