Lesson 1Landscaping and External Works Scope: Softscaping, Paving, Drainage, Lighting, and Excluded Long-Term MaintenanceSets out landscaping and outside works scope, covering plants, paths, water flow, and lights. Stresses links with civil works and services, record standards, and clear outs for ongoing upkeep duties in South Sudan.
Softscape planting and soil preparationHardscape paving, curbs, and edgingSite drainage and grading interfacesExterior lighting and power provisionsIrrigation systems and water sourcesMaintenance and warranty exclusionsLesson 2Electrical Scope: Service Connection, Distribution, Lighting, Power Outlets, Metering for Retail and Apartments, and Excluded Tenant Fit-OutSets electrical scope from entry point to end circuits, including spread, lights, plugs, and meters. Clears teamwork with service providers, rule following, checks, and outs for tenant setup works in South Sudanese buildings.
Utility service entry and main switchgearDistribution boards and riser routingGeneral lighting and emergency lightingPower outlets and dedicated circuitsMetering for retail and apartmentsTenant fit-out and equipment exclusionsLesson 3Demolition Scope: Included Tasks, Site Protection, Hazardous Materials Exclusion, and Utility DisconnectsExplains demolition scope, covering choice removal, structure safety, and waste handling. Highlights needs for checks, temp supports, dust and sound control, and outs for danger material cleanups in South Sudan.
Pre-demolition surveys and recordsSelective demolition and sequencingTemporary shoring and bracing needsDust, noise, and vibration controlsDebris handling and disposal routesHazardous materials scope exclusionsLesson 4Exterior Façade and Glazing Scope: Cladding Systems, Curtain Wall, Waterproofing, Flashings, and Excluded SignageClears scope for outside walls and glass, including covers, wall systems, water-proofing, and seals. Tackles performance needs, tests, structure links, and clear outs like signs and marks in South Sudanese urban builds.
Cladding materials and support systemsCurtain wall design and interfacesAir, water, and thermal performanceFlashing, sealants, and terminationsGlazing types, coatings, and safetySignage and branding scope exclusionsLesson 5Foundations and Concrete Structure Scope: Excavation, Shoring, Formwork, Reinforcement, Concrete Pours, and Excluded Geotechnical RemediationDescribes base and concrete frame scope, from digging and supports to bars and pours. Covers molds, inserts, limits, curing, and links with ground data, excluding fixes beyond design in South Sudan.
Excavation limits and stockpile areasShoring, underpinning, and safetyFormwork design, stripping, and reuseReinforcement supply and placementConcrete mixes, pours, and curingGeotechnical remediation exclusionsLesson 6HVAC Scope: Central Plant vs Packaged Units, Distribution, Ventilation, Controls, Commissioning, and Excluded Tenant HVAC ConnectionsClears HVAC scope, including main plant or units, ducts, pipes, and air flow. Defines controls, balance, startup deliveries, and clear outs for tenant extensions and special systems in South Sudanese projects.
System basis: central plant vs packagedAir distribution ductwork and grillesHydronic piping and equipment linksVentilation, exhaust, and makeup airControls, BMS, testing, and balancingTenant HVAC extensions and exclusionsLesson 7Finishes Scope: Flooring, Wall Finishes, Ceilings, Doors/Frames, Painting, and Exclusions for Specialty FixturesCovers finish scope for floors, walls, ceilings, doors, and paint. Defines base readiness, samples, quality marks, and trade links, while clearing outs for special fittings and owner items in South Sudan.
Flooring types, prep, and transitionsWall finishes and substrate criteriaCeiling systems and access panelsDoors, frames, and hardware limitsPainting systems and surface prepSpecialty fixtures and FFE exclusionsLesson 8Plumbing Scope: Domestic Cold/Hot Water, Sanitary Drainage, Stormwater Disposal, Roof Drainage, and Excluded Tenant FixturesDefines plumbing scope for water, waste, and rain systems, including roof flow. Addresses paths, pipe types, tests, and rule following, and clears outs for tenant fittings and special gear links in South Sudan.
Domestic cold and hot water routingSanitary drainage and venting layoutStormwater and site drainage linksRoof drainage and overflow designPipe materials, insulation, and testingTenant fixtures and equipment exclusionsLesson 9Masonry and Drywall Scope: Load-Bearing Masonry, Blockwork, Partition Walls, Insulation, and Finish TolerancesDetails stone and wallboard scope, including weight-bearing walls, blocks, dividers, insulation, and finish limits. Covers structure links, fire and sound ratings, openings, and backing duties in South Sudanese builds.
Load-bearing masonry and engineering dataNon-load-bearing blockwork and infillDrywall partitions and framing layoutFire and acoustic rated assembliesInsulation types and installation limitsFinish levels and tolerance criteria