Lesson 1Work center fields to maintain for CNC-MILL-01: standard value key, scheduling indicator, capacity category, machine hour rate, and external processing flagsFocus on CNC-MILL-01 work center fields that impact scheduling, capacity, and costing. Learn to set standard value keys, scheduling indicators, capacity categories, machine hour rates, and flags for external processing scenarios.
Choose appropriate standard value keySet scheduling and capacity indicatorsMaintain capacity category for machineDefine machine hour and labor ratesFlag external processing where neededLesson 2Material master for finished good FH-1000: relevant fields and recommended settings (MRP type, lot sizing, strategy group, procurement type, lead times, consumption mode)Configure the FH-1000 finished good material master for planning and execution. Learn recommended settings for MRP type, lot sizing, strategy group, procurement type, lead times, and consumption parameters for demand planning.
Select MRP type and planning horizonDefine lot sizing and rounding valuesSet strategy group and requirements typeChoose procurement type and special stockMaintain lead times and consumption modeLesson 3Bill of Materials (BOM) for FH-1000: types of BOMs, structure levels, component quantity determination, alternative and phantom BOMs, explosion behaviorUnderstand FH-1000 BOM structures and behavior. Learn BOM types, multi-level structures, quantity calculation, alternative and phantom BOMs, and explosion settings that affect MRP and order creation.
Different BOM types and usage fieldsDesign multi-level BOM structuresControl component quantity calculationConfigure alternative and phantom BOMsSet BOM explosion and selection rulesLesson 4Routing details for CNC-MILL-01: operation sequence, standard values (setup, machine, labor times), in-house vs external operations, and allocation to work centersDetail routing data for CNC-MILL-01 operations. You will define operation sequences, setup and machine times, internal versus external processing, and correct allocation of operations to work centers for FH-1000.
Define main and sub operation sequencesMaintain setup, machine, and labor timesUse control keys for in-house stepsConfigure external processing operationsAllocate operations to CNC-MILL-01Lesson 5Material master MRP views: MRP type (PD/VB/P1/etc.), MRP controller, Lot size indicators (EX, HB, FX), Safety stock fields, Reorder point, Procurement type (F/P) and special procurementExplore MRP views in the material master for FH-1000 and its components. Learn how MRP type, controller, lot size, safety stock, reorder point, and procurement type influence planning proposals and stock levels.
Set MRP type and MRP controllerChoose lot size EX, HB, FX, and othersMaintain safety stock and coverage profileDefine reorder point and planning time fenceSet procurement type and special procurementLesson 6Work center configuration: capacity (available hours, shifts), machine vs labor capacities, formulas for available capacity, cost center assignment, calendar and shift definitionsUnderstand how to configure work centers with correct capacity, calendars, and cost links. You will define machine and labor capacities, capacity formulas, cost center assignments, and shift patterns that drive scheduling and costing.
Define work center categories and typesSet available capacity and shift patternsConfigure machine and labor capacitiesMaintain capacity formulas and unitsAssign cost centers and activity typesLesson 7Material master for semi-finished and raw materials: lot size strategies, valuation, batch management flags, plant/storage location settingsLearn how to maintain material masters for raw and semi-finished materials, focusing on MRP and lot sizing, valuation and price control, batch management, and plant or storage location views that drive planning and shop floor execution.
Define MRP and lot size for componentsSet valuation class and price controlConfigure batch management indicatorsMaintain plant and storage location viewsControl availability check and ATP rulesLesson 8Routing and Production Version: defining operations for FH-1000, linking routing to BOM via production versions, multiple routings for alternate flowsLearn how to build routings and production versions for FH-1000. You will define operations, assign work centers, and link routings to BOMs via production versions to support multiple production alternatives.
Create routing header and basic dataDefine operations and work center linksMaintain operation control keys and timesSet up production versions with BOMsManage alternate and parallel routingsLesson 9BOM setup for FH-1000: list components, quantities, reference designators, component scrap allowance, validity dates, and effectivity controlConfigure the FH-1000 BOM with correct components, quantities, and scrap. Learn to use reference designators, validity dates, and effectivity to control which components are used in planning and production over time.
Create FH-1000 BOM header dataMaintain component items and quantitiesSet component scrap and operation scrapUse reference designators for assembliesControl validity dates and change numbers