Lesson 1Safe removal of old boiler and radiators: mechanical fixing removal, managing old materials (corroded steel) and temporary supportsDescribes safe isolation an dismantling of old boilers an radiators, including supporting pipework, handling corroded components, an segregating waste. Emphasizes manual handling, dust control, an protection of finishes.
Supporting pipework before disconnectionRemoving wall fixings and bracketsHandling corroded radiators and sludgeProtecting floors and wall finishesSegregating scrap metal and wasteLesson 2Radiator installation and valve connections: pipework layout (surface vs concealed), valve orientation, compression vs soldered joints, supports and wall fixingExplains how fi plan an install radiator pipework, select suitable jointing methods, orient valves correctly, an apply proper support an fixing techniques fi ensure reliable operation, quiet running, an long-term system durability.
Surface vs concealed pipework routingValve orientation and flow directionCompression vs soldered joint selectionBracket positioning and wall anchorsAllowing for expansion and movementLesson 3Flue installation and commissioning: correct flue route, sealing, condensate trap, and flue performance checksDetails correct flue routing, terminal siting, an support, wid emphasis pon sealed joints, condensate management, an compliance checks. Explains how fi verify flue integrity, draft, an performance during commissioning an handover.
Selecting compliant flue routeClearances to openings and boundariesSealing joints and wall penetrationsCondensate trap and fall requirementsFlue integrity and draft verificationLesson 4Gas connection and testing: sizing and routing gas pipe, torque and fitting standards, performing gas tightness test and documenting resultsCovers gas pipe sizing, routing, an support, correct use of fittings an torque, an tightness testing. Includes documenting results, dealing wid test failures, an ensuring compliance wid relevant gas safety standards.
Calculating gas pipe size and lossesRouting and supporting gas pipeworkApproved fittings and torque valuesTightness and let-by test stepsRecording and interpreting test dataLesson 5Boiler siting and mounting: wall-hung bracket installation, clearances, service access, condensate trap and correct fallDescribes selecting a suitable boiler location, fixing wall brackets, lifting an hanging di appliance, an maintaining clearances. Covers condensate trap connection, pipe fall, an provision fi future servicing an maintenance.
Assessing boiler location and clearancesFixing and leveling wall bracketLifting and hanging boiler safelyRouting condensate with correct fallMaintaining service access zonesLesson 6System filling, venting and pressurization: controlled fill, automatic air vents, manual venting sequence, setting system pressureExplains controlled system filling, use of automatic an manual air vents, correct venting sequence, an setting cold fill pressure. Includes checks fi hidden air pockets an re-pressurization after initial heat-up.
Pre-fill checks and valve positionsControlled filling rate and monitoringUsing automatic air vents effectivelyManual venting of radiators and coilsSetting and verifying cold fill pressureLesson 7Documentation and labeling: labelling valves, providing operation stickers, recording pressures, serial numbers, and commissioning readingsExplains how fi label valves, circuits, an appliances, provide user-friendly operating stickers, an record key data such as pressures, serial numbers, an combustion results fi create a clear, auditable installation record.
Labelling isolation and control valvesCircuit and radiator identification tagsUser operating and safety stickersRecording serials and set pressuresStoring commissioning certificatesLesson 8Isolation and safe draining of existing system: sequence to isolate gas, water, electricity; draining procedures and safe disposal of waterCovers safe isolation of gas, water, an electrical supplies before work, stepwise draining of heating circuits, managing trapped water, an environmentally compliant disposal, while preventing damage to property an existing components.
Locking off gas and verifying isolationIsolating cold feed and heating circuitsElectrical lockout and safe confirmationLocating and opening drain-off pointsCollecting and disposing of waste waterLesson 9Commissioning and first fire: purge procedure for air removal, low-load start, checking flow temperatures and return temperatures, flue gas analysis basics and CO checkGuides di first firing of di boiler, including purging air from gas an water circuits, starting at low load, an stabilizing temperatures. Introduces basic flue gas analysis, CO checks, an documenting commissioning readings.
Filling, venting, and leak recheckGas purge and ignition sequenceLow-load warm-up and balancingMeasuring flow and return temperaturesBasic flue gas and CO checksLesson 10Pre-work checks and preparations: site survey, locating services, permits, notifications to gas supplier/authority where requiredFocuses pon pre-installation tasks, including site survey, identifying hidden services, assessing ventilation an access, an confirming permits or notifications. Ensures work can proceed safely, legally, an wid minimal disruption.
Reviewing drawings and specificationsLocating gas, water, and cablesAssessing ventilation and access routesConfirming permits and notificationsPlanning waste removal and storageLesson 11Plumbing and hydraulic connections: flow/return connection, system filling loop, fitting expansion vessel and safety valves, integrating magnetic filter and non-return valveAddresses hydraulic connections to di boiler, including flow an return, filling loop, expansion vessel, safety valves, filters, an check valves. Emphasizes correct orientation, isolation, an service access fi each component.
Connecting primary flow and returnInstalling filling loop and isolationMounting expansion vessel correctlyFitting safety valve and discharge pipeIntegrating filter and non-return valve