Lesson 1Work center fields fi maintain fi CNC-MILL-01: standard value key, scheduling indicator, capacity category, machine hour rate, an external processing flagsFocus pon CNC-MILL-01 work center fields dat impact scheduling, capacity, an costing. Learn fi set standard value keys, scheduling indicators, capacity categories, machine hour rates, an flags fi external processing scenarios.
Choose appropriate standard value keySet scheduling and capacity indicatorsMaintain capacity category for machineDefine machine hour and labor ratesFlag external processing where neededLesson 2Material master fi finished good FH-1000: relevant fields an recommended settings (MRP type, lot sizing, strategy group, procurement type, lead times, consumption mode)Configure di FH-1000 finished good material master fi planning an execution. Learn recommended settings fi MRP type, lot sizing, strategy group, procurement type, lead times, an consumption parameters fi demand planning.
Select MRP type and planning horizonDefine lot sizing and rounding valuesSet strategy group and requirements typeChoose procurement type and special stockMaintain lead times and consumption modeLesson 3Bill a Materials (BOM) fi FH-1000: types a BOMs, structure levels, component quantity determination, alternative an phantom BOMs, explosion behaviorUnderstand FH-1000 BOM structures an behavior. Learn BOM types, multi-level structures, quantity calculation, alternative an phantom BOMs, an explosion settings dat affect MRP an order creation.
Different BOM types and usage fieldsDesign multi-level BOM structuresControl component quantity calculationConfigure alternative and phantom BOMsSet BOM explosion and selection rulesLesson 4Routing details fi CNC-MILL-01: operation sequence, standard values (setup, machine, labor times), in-house vs external operations, an allocation to work centersDetail routing data fi CNC-MILL-01 operations. Yuh wi define operation sequences, setup an machine times, internal versus external processing, an correct allocation a operations to work centers fi FH-1000.
Define main and sub operation sequencesMaintain setup, machine, and labor timesUse control keys for in-house stepsConfigure external processing operationsAllocate operations to CNC-MILL-01Lesson 5Material master MRP views: MRP type (PD/VB/P1/etc.), MRP controller, Lot size indicators (EX, HB, FX), Safety stock fields, Reorder point, Procurement type (F/P) an special procurementExplore MRP views in di material master fi FH-1000 an its components. Learn how MRP type, controller, lot size, safety stock, reorder point, an procurement type influence planning proposals an stock levels.
Set MRP type and MRP controllerChoose lot size EX, HB, FX, and othersMaintain safety stock and coverage profileDefine reorder point and planning time fenceSet procurement type and special procurementLesson 6Work center configuration: capacity (available hours, shifts), machine vs labor capacities, formulas fi available capacity, cost center assignment, calendar an shift definitionsUnderstand how fi configure work centers wid correct capacity, calendars, an cost links. Yuh wi define machine an labor capacities, capacity formulas, cost center assignments, an shift patterns dat drive scheduling an costing.
Define work center categories and typesSet available capacity and shift patternsConfigure machine and labor capacitiesMaintain capacity formulas and unitsAssign cost centers and activity typesLesson 7Material master fi semi-finished an raw materials: lot size strategies, valuation, batch management flags, plant/storage location settingsLearn how fi maintain material masters fi raw an semi-finished materials, focusing pon MRP an lot sizing, valuation an price control, batch management, an plant or storage location views dat drive planning an shop floor execution.
Define MRP and lot size for componentsSet valuation class and price controlConfigure batch management indicatorsMaintain plant and storage location viewsControl availability check and ATP rulesLesson 8Routing an Production Version: defining operations fi FH-1000, linking routing to BOM via production versions, multiple routings fi alternate flowsLearn how fi build routings an production versions fi FH-1000. Yuh wi define operations, assign work centers, an link routings to BOMs via production versions fi support multiple production alternatives.
Create routing header and basic dataDefine operations and work center linksMaintain operation control keys and timesSet up production versions with BOMsManage alternate and parallel routingsLesson 9BOM setup fi FH-1000: list components, quantities, reference designators, component scrap allowance, validity dates, an effectivity controlConfigure di FH-1000 BOM wid correct components, quantities, an scrap. Learn fi use reference designators, validity dates, an effectivity fi control which components use in planning an production over time.
Create FH-1000 BOM header dataMaintain component items and quantitiesSet component scrap and operation scrapUse reference designators for assembliesControl validity dates and change numbers